Build Bezel process-expectations idea-001
process-expectations artifact · for Build Bezel · phase idea-001 · status draft
process-expectations artifact · for Build Bezel · phase idea-001 · status draft
No explicit evidence field yet. Require tests, screenshots, linked PRs, or reviewed outputs before marking complete.
- phase: idea-001
- artifact: process-expectations
- positioning: This is a production product-definition process, not a quick mockup generator.
- resume model: Like doing taxes: each step is saved, the user always knows what is complete, what is next, what is blocked, and where to resume.
- expectation copy: For meaningful products, plan to spend a couple of focused hours reviewing intent, assumptions, AI-first opportunities, screens, workflows, architecture, and build plan before development starts. Bezel will guide the whole process and save progress at every step.
- project size guidance: 3 items
- required progress states: 6 items
Machine-readable source fields
idea-001
process-expectations
This is a production product-definition process, not a quick mockup generator.
Like doing taxes: each step is saved, the user always knows what is complete, what is next, what is blocked, and where to resume.
For meaningful products, plan to spend a couple of focused hours reviewing intent, assumptions, AI-first opportunities, screens, workflows, architecture, and build plan before development starts. Bezel will guide the whole process and save progress at every step.
| size | description |
|---|---|
| small | One-page or narrow workflow; may move through a short one-pass flow. |
| medium | Multiple screens or user roles; needs intent, AI-first reframe, screen map, wireframes, architecture, and plan review. |
| large_or_multiphase | Multiple workflows, systems, or releases; must be categorized and phased before detailed design. |
- not_started
- in_progress
- needs_review
- approved
- blocked
- revised